18:52 14 Nov 25
CPA
9502-P2-0004-CP2 :
10 MW Solar Power Project by Ushodaya Enterprises Private Limited in Mahabubnagar, Andhra Pradesh CPA S004
[]
| PoA | 9502: PoA on RE |
|---|---|
| CPA |
10 MW Solar Power Project by Ushodaya Enterprises Private Limited in Mahabubnagar, Andhra Pradesh CPA S004
cpa design document (963 KB)
Additional documents for this specific CPA Appendix 1 - ER UN 9502 P1 0004 CP1 BELL_CDM_CPA_PoA_RCP_12122 (26 KB)
Appendix 2 - FVR CPA S004 BELL_CDM_CPA_PoA_RCP_12122 (235 KB)
Additional renewal documents CPA renewal form (76 KB)
|
| Host Parties | India |
| Amount of Reductions | 14,999 metric tonnes CO2 equivalent per annum |
| Crediting Period |
01 Oct 2021
-
30 Sep 2028
(Renewable)
Other period(s): 01 Oct 14 - 30 Sep 21 |
| Renewal date | 30 Sep 2022 Provisional (awaiting guidance from the CMP at CMP 16) (view renewal) |

cpa design document
Appendix 1 - ER UN 9502 P1 0004 CP1 BELL_CDM_CPA_PoA_RCP_12122
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: