PoA 2765 : Installation of Solar Home Systems in Bangladesh
<< view PoA

CPAs below renewed on 26 Aug 2021
Including DOE LGAI Tech. Center S.A

Displaying 1-5 of 5
Ref Title
2765-P2-0009-CP2 Installation of Solar Home Systemsin Bangladesh (01/01/2013 to 31/08/2013) by Grameen Shakti
2765-P2-0010-CP2 Installation of Solar Home Systems in Bangladesh (01/09/2013 to 30/04/2014) by Grameen Shakti
2765-P2-0011-CP2 Installation of Solar Home Systems in Bangladesh (01/05/2014 to 31/12/2014) by Grameen Shakti
2765-P2-0012-CP2 Installation of Solar Home Systemsin Bangladesh (01/01/2013 to 31/08/2013) by IDCOL
2765-P2-0013-CP2 Installation of Solar Home Systemsin Bangladesh (01/09/2013 to 30/04/2014) by IDCOL

Additional inclusion documents IDCOL PoA_2765_CPA_RCP_FVR(CPA 9-13) (380 KB)
CPA renewal of crediting period notification form CPA renewal form (67 KB)