Small Hydro Power Programme of Activities in DPRK
Host party(ies) Republic of Korea
Methodology(ies) AMS-I.D. ver. 18
Standardised Baselines N/A
Estimated total annual GHG emission reductions or removal enhancements of all specific-case CPAs 56,794
DOE/AE TÜV NORD CERT GmbH
Coordinating and managing entity (CME) General Bureau for Cooperation with International Organizations (GBCIO)
Period for comments 05 Jul 19 - 03 Aug 19 (23:59:59 GMT)
Project Participants(s) for which DOE have a contractual obligation KRICCCS
The operational/applicant entity working on this project has decided to make the Project Design Document (PDD) publicly available directly on the UNFCCC CDM website.
POA-DD POA-DD (1011 KB)
Local stakeholder consultation report: N/A
Impact assessment summary: N/A
CPA-DD Not Applicable
Specific CPA-DD
CPA-DD (681 KB)
Proposed CP start date: 29 Apr 2017 Length of CP: 10
Submission of comments to the DOE/AE
The comment period is over.
No comments received.
* Emission reductions in metric tonnes of CO2 equivalent per annum that are based on the estimates provided by the project participants in unvalidated PDDs