Caribbean Hotels’ Energy Efficiency and Renewable Energy Programme
Host party(ies) Barbados
Methodology(ies) AMS-I.F. ver. 3
AMS-II.E. ver. 10
Standardised Baselines N/A
Estimated total annual GHG emission reductions or removal enhancements of all specific-case CPAs 14
DOE/AE AENOR Confía, S.A.U.
Coordinating and managing entity (CME) Caribbean Hotel and Tourism Association (CHTA)
Period for comments 04 Mar 16 - 02 Apr 16 (23:59:59 GMT)
Project Participants(s) for which DOE have a contractual obligation Caribbean Hotel and Tourism Association (CHTA)
The operational/applicant entity working on this project has decided to make the Project Design Document (PDD) publicly available directly on the UNFCCC CDM website.
POA-DD POA-DD (2478 KB)
Local stakeholder consultation report: N/A
Impact assessment summary: N/A
CPA-DD Not Applicable
Specific CPA-DD
CHENACT CPA-DD specific Crane Resort (873 KB)
Proposed CP start date: 01 May 2016 Length of CP: 7
Submission of comments to the DOE/AE
The comment period is over.
* Emission reductions in metric tonnes of CO2 equivalent per annum that are based on the estimates provided by the project participants in unvalidated PDDs