Punjab State Electricity Board: High Voltage Distribution System for Agricultural Consumers in the Rural Areas of the Punjab.
Host party(ies) India
Methodology(ies) AMS-II.A. ver. 10
Standardised Baselines N/A
Estimated total annual GHG emission reductions or removal enhancements of all specific-case CPAs 14,248
DOE/AE Bureau Veritas India Pvt. Ltd.
Period for comments 27 Dec 09 - 25 Jan 10
The operational/applicant entity working on this project has decided to make the Project Design Document (PDD) publicly available directly on the UNFCCC CDM website.
POA-DD POA-DD (1199 KB)
Local stakeholder consultation report: N/A
Impact assessment summary: N/A
CPA-DD CPA-DD (819 KB)
Specific CPA-DD Specific CPA-DD (897 KB)
Submission of comments to the DOE/AE
The comment period is over.
No comments received.
* Emission reductions in metric tonnes of CO2 equivalent per annum that are based on the estimates provided by the project participants in unvalidated PDDs