Senegal Rural Electrification Program
Host party(ies) Senegal
Methodology(ies) AMS-III.AR. ver. 5
AMS-III.BL.
Standardised Baselines N/A
Estimated total annual GHG emission reductions or removal enhancements of all specific-case CPAs 13,865
DOE/AE AENOR INTERNACIONAL, S.A.U.
Coordinating and managing entity (CME) Agence Senegalaise d’Electrification Rurale (ASER)
Period for comments 01 Oct 16 - 30 Oct 16 (23:59:59 GMT)
Project Participants(s) for which DOE have a contractual obligation International Bank for Reconstruction and Development (IBRD) as trustee of the Carbon Initiative for Development (Ci-Dev)
The operational/applicant entity working on this project has decided to make the Project Design Document (PDD) publicly available directly on the UNFCCC CDM website.
POA-DD POA-DD (775 KB)
Local stakeholder consultation report: N/A
Impact assessment summary: N/A
CPA-DD Not Applicable
Specific CPA-DD
ASER CPA DD CPA1 MG 2016.09.21 (234 KB)
Proposed CP start date: 01 Nov 2011 Length of CP: 21
ASER CPA DD CPA2 Grid 2016.09.21 (235 KB)
Proposed CP start date: 01 Nov 2011 Length of CP: 21
ASER CPA DD CPA3 SHS 2016.09.21 (207 KB)
Proposed CP start date: 01 Nov 2011 Length of CP: 21
Submission of comments to the DOE/AE
The comment period is over.
* Emission reductions in metric tonnes of CO2 equivalent per annum that are based on the estimates provided by the project participants in unvalidated PDDs