Malaysia Biomass Power Plant Project
Host party(ies) Malaysia
Methodology(ies) ACM0018
Standardised Baselines N/A
Estimated total annual GHG emission reductions or removal enhancements of all specific-case CPAs 197,161
DOE/AE Bureau Veritas India Pvt. Ltd.
Period for comments 18 May 11 - 16 Jun 11
The operational/applicant entity working on this project has decided to make the Project Design Document (PDD) publicly available directly on the UNFCCC CDM website.
POA-DD POA-DD (616 KB)
Local stakeholder consultation report: N/A
Impact assessment summary: N/A
CPA-DD CPA-DD (333 KB)
Specific CPA-DD Specific CPA-DD (874 KB)
Submission of comments to the DOE/AE
The comment period is over.
* Emission reductions in metric tonnes of CO2 equivalent per annum that are based on the estimates provided by the project participants in unvalidated PDDs