The Uganda Improved Cookstove and Water Purifier Project by the Korea East-West Power Company
Host party(ies) Uganda
Methodology(ies) AMS-III.AV. ver. 7
AMS-II.G. ver. 11
Standardised Baselines ASB0002-2017 ver 01.0 - Standardized baseline: Fuel switch, technology switch and methane destruction in the charcoal sector of Uganda
Estimated total annual GHG emission reductions or removal enhancements of all specific-case CPAs 639,100
DOE/AE Korean Foundation for Quality
Coordinating and managing entity (CME) Korea East-West Power Company.Co.Ltd
Period for comments 16 May 20 - 14 Jun 20 (23:59:59 GMT)
Project Participants(s) for which DOE have a contractual obligation Korea East-West Power Company.Co.Ltd
The operational/applicant entity working on this project has decided to make the Project Design Document (PDD) publicly available directly on the UNFCCC CDM website.
POA-DD POA-DD (1401 KB)
Local stakeholder consultation report: N/A
Impact assessment summary: N/A
CPA-DD Not Applicable
Specific CPA-DD
Generic CPA-DD_Uganda_v1.0 (1401 KB)
Proposed CP start date: 15 May 2020 Length of CP: 7
Submission of comments to the DOE/AE
The comment period is over.
No comments received.
* Emission reductions in metric tonnes of CO2 equivalent per annum that are based on the estimates provided by the project participants in unvalidated PDDs