Small Hydro Power Programme of Activities in Iran
Host party(ies) Iran (Islamic Republic of)
Methodology(ies) AMS-I.D. ver. 18
Standardised Baselines N/A
Estimated total annual GHG emission reductions or removal enhancements of all specific-case CPAs 81,594
DOE/AE Carbon Check (India) Private Ltd.
Coordinating and managing entity (CME) Mehr Renewable Energy Company (MRE)
Period for comments 07 Oct 15 - 05 Nov 15 (23:59:59 GMT)
Project Participants(s) for which DOE have a contractual obligation Mehr Renewable Energy Company (MRE)
The operational/applicant entity working on this project has decided to make the Project Design Document (PDD) publicly available directly on the UNFCCC CDM website.
POA-DD POA-DD (827 KB)
Local stakeholder consultation report: N/A
Impact assessment summary: N/A
CPA-DD Not Applicable
Specific CPA-DD
Untitled (uploaded 06 Oct 15 13:59:16) (798 KB)
Proposed CP start date: 01 Apr 2017 Length of CP: 7
Untitled (uploaded 06 Oct 15 14:20:31) (1005 KB)
Proposed CP start date: 01 Apr 2017 Length of CP: 7
Untitled (uploaded 06 Oct 15 14:20:32) (991 KB)
Proposed CP start date: 01 Apr 2017 Length of CP: 7
Untitled (uploaded 06 Oct 15 14:20:31) (795 KB)
Proposed CP start date: 01 Apr 2016 Length of CP: 7
Submission of comments to the DOE/AE
The comment period is over.
* Emission reductions in metric tonnes of CO2 equivalent per annum that are based on the estimates provided by the project participants in unvalidated PDDs