Small Hydropower Programme in Colombia
Host party(ies) Colombia
Methodology(ies) AMS-I.D. ver. 17
Standardised Baselines N/A
Estimated total annual GHG emission reductions or removal enhancements of all specific-case CPAs 19,073
DOE/AE KBS Certification Services Limited
Period for comments 17 Jan 12 - 15 Feb 12
The operational/applicant entity working on this project has decided to make the Project Design Document (PDD) publicly available directly on the UNFCCC CDM website.
POA-DD POA-DD (772 KB)
Local stakeholder consultation report: N/A
Impact assessment summary: N/A
CPA-DD CPA-DD (318 KB)
Specific CPA-DD Specific CPA-DD (512 KB)
Submission of comments to the DOE/AE
The comment period is over.
No comments received.
* Emission reductions in metric tonnes of CO2 equivalent per annum that are based on the estimates provided by the project participants in unvalidated PDDs