Masca Small Hydro Programme
Host party(ies) Honduras
Methodology(ies) AMS-I.D. ver. 13
Standardised Baselines N/A
Estimated total annual GHG emission reductions or removal enhancements of all specific-case CPAs 3,952
DOE/AE TÜV SÜD South Asia Private Limited
Period for comments 16 Dec 08 - 14 Jan 09
The operational/applicant entity working on this project has decided to make the Project Design Document (PDD) publicly available directly on the UNFCCC CDM website.
POA-DD POA-DD (301 KB)
Local stakeholder consultation report: N/A
Impact assessment summary: N/A
CPA-DD CPA-DD (146 KB)
Specific CPA-DD Specific CPA-DD (529 KB)
Submission of comments to the DOE/AE
The comment period is over.
* Emission reductions in metric tonnes of CO2 equivalent per annum that are based on the estimates provided by the project participants in unvalidated PDDs