Peruvian PoA for NCRE projects
Host party(ies) Peru
Methodology(ies) ACM0002 ver. 17
Standardised Baselines N/A
Estimated total annual GHG emission reductions or removal enhancements of all specific-case CPAs 51,746
DOE/AE TÜV NORD CERT GmbH
Coordinating and managing entity (CME) ENGIE Energía Perú S.A.
Period for comments 19 Jul 17 - 17 Aug 17 (23:59:59 GMT)
Project Participants(s) for which DOE have a contractual obligation ENGIE Energía Perú S.A.
The operational/applicant entity working on this project has decided to make the Project Design Document (PDD) publicly available directly on the UNFCCC CDM website.
POA-DD POA-DD (1608 KB)
Local stakeholder consultation report: N/A
Impact assessment summary: N/A
CPA-DD Not Applicable
Specific CPA-DD
17/123 CPA-DD (762 KB)
Proposed CP start date: 01 Jan 2018 Length of CP: 21
Submission of comments to the DOE/AE
The comment period is over.
No comments received.
* Emission reductions in metric tonnes of CO2 equivalent per annum that are based on the estimates provided by the project participants in unvalidated PDDs