International Renewable Electrification and Safe Drinking Water Supply Program
Host party(ies) Burkina Faso
Benin
Brazil
Colombia
Costa Rica
Dominican Republic
Ethiopia
Ghana
Guinea
Haiti
Indonesia
India
Kenya
Lesotho
Morocco
Madagascar
Mali
Malawi
Mozambique
Namibia
Nigeria
Nicaragua
Senegal
Togo
Tonga
United Republic of Tanzania
Venezuela
Viet Nam
South Africa
Zambia
Methodology(ies) AMS-I.L. ver. 3
AMS-III.AV. ver. 8
AMS-I.D. ver. 18
Standardised Baselines N/A
Estimated total annual GHG emission reductions or removal enhancements of all specific-case CPAs 1
DOE/AE Carbon Check (India) Private Ltd.
Coordinating and managing entity (CME) atmosfair gGmbH
Period for comments 29 Aug 20 - 27 Sep 20 (23:59:59 GMT)
Project Participants(s) for which DOE have a contractual obligation atmosfair gGmbH
The operational/applicant entity working on this project has decided to make the Project Design Document (PDD) publicly available directly on the UNFCCC CDM website.
POA-DD POA-DD (1763 KB)
Local stakeholder consultation report: N/A
Impact assessment summary: N/A
CPA-DD Not Applicable
Specific CPA-DD
PoA_DD_Renewable FinalDraft 28082020 (1763 KB)
Proposed CP start date: 28 Aug 2020 Length of CP: 7
PoA_DD_Renewable FinalDraft 28082020 (1763 KB)
Proposed CP start date: 28 Aug 2020 Length of CP: 7
PoA_DD_Renewable FinalDraft 28082020 (1763 KB)
Proposed CP start date: 20 Aug 2020 Length of CP: 7
PoA_DD_Renewable FinalDraft 28082020 (1763 KB)
Proposed CP start date: 20 Aug 2020 Length of CP: 7
PoA_DD_Renewable FinalDraft 28082020 (1763 KB)
Proposed CP start date: 20 Aug 2020 Length of CP: 7
PoA_DD_Renewable FinalDraft 28082020 (1763 KB)
Proposed CP start date: 28 Aug 2020 Length of CP: 7
PoA_DD_Renewable FinalDraft 28082020 (1763 KB)
Proposed CP start date: 28 Aug 2020 Length of CP: 7
PoA_DD_Renewable FinalDraft 28082020 (1763 KB)
Proposed CP start date: 28 Aug 2020 Length of CP: 7
PoA_DD_Renewable FinalDraft 28082020 (1763 KB)
Proposed CP start date: 28 Aug 2020 Length of CP: 7
PoA_DD_Renewable FinalDraft 28082020 (1763 KB)
Proposed CP start date: 28 Aug 2020 Length of CP: 7
PoA_DD_Renewable FinalDraft 28082020 (1763 KB)
Proposed CP start date: 28 Aug 2020 Length of CP: 7
PoA_DD_Renewable FinalDraft 28082020 (1763 KB)
Proposed CP start date: 28 Aug 2020 Length of CP: 7
PoA_DD_Renewable FinalDraft 28082020 (1763 KB)
Proposed CP start date: 28 Aug 2020 Length of CP: 7
PoA_DD_Renewable FinalDraft 28082020 (1763 KB)
Proposed CP start date: 28 Aug 2020 Length of CP: 7
PoA_DD_Renewable FinalDraft 28082020 (1763 KB)
Proposed CP start date: 28 Aug 2020 Length of CP: 7
PoA_DD_Renewable FinalDraft 28082020 (1763 KB)
Proposed CP start date: 28 Aug 2020 Length of CP: 7
PoA_DD_Renewable FinalDraft 28082020 (1763 KB)
Proposed CP start date: 28 Aug 2020 Length of CP: 7
PoA_DD_Renewable FinalDraft 28082020 (1763 KB)
Proposed CP start date: 28 Aug 2020 Length of CP: 7
PoA_DD_Renewable FinalDraft 28082020 (1763 KB)
Proposed CP start date: 28 Aug 2020 Length of CP: 7
PoA_DD_Renewable FinalDraft 28082020 (1763 KB)
Proposed CP start date: 28 Aug 2020 Length of CP: 7
PoA_DD_Renewable FinalDraft 28082020 (1763 KB)
Proposed CP start date: 28 Aug 2020 Length of CP: 7
PoA_DD_Renewable FinalDraft 28082020 (1763 KB)
Proposed CP start date: 28 Aug 2020 Length of CP: 7
PoA_DD_Renewable FinalDraft 28082020 (1763 KB)
Proposed CP start date: 28 Aug 2020 Length of CP: 7
PoA_DD_Renewable FinalDraft 28082020 (1763 KB)
Proposed CP start date: 28 Aug 2020 Length of CP: 7
PoA_DD_Renewable FinalDraft 28082020 (1763 KB)
Proposed CP start date: 28 Aug 2020 Length of CP: 7
PoA_DD_Renewable FinalDraft 28082020 (1763 KB)
Proposed CP start date: 28 Aug 2020 Length of CP: 7
PoA_DD_Renewable FinalDraft 28082020 (1763 KB)
Proposed CP start date: 28 Aug 2020 Length of CP: 7
PoA_DD_Renewable FinalDraft 28082020 (1763 KB)
Proposed CP start date: 28 Aug 2020 Length of CP: 7
PoA_DD_Renewable FinalDraft 28082020 (1763 KB)
Proposed CP start date: 28 Aug 2020 Length of CP: 7
PoA_DD_Renewable FinalDraft 28082020 (1763 KB)
Proposed CP start date: 28 Aug 2020 Length of CP: 7
Submission of comments to the DOE/AE
The comment period is over.
No comments received.
* Emission reductions in metric tonnes of CO2 equivalent per annum that are based on the estimates provided by the project participants in unvalidated PDDs