Move-Ethiopia zero-carbon mobility units Program (the PoA)
Host party(ies) Ethiopia
Methodology(ies) AMS-III.C. ver. 15
Standardised Baselines N/A
Estimated total annual GHG emission reductions or removal enhancements of all specific-case CPAs 60,000
DOE/AE EPIC Sustainability Services Pvt. Ltd.
Coordinating and managing entity (CME) Ethan Bio-Fuels PLC
Period for comments 21 Aug 18 - 19 Sep 18 (23:59:59 GMT)
Project Participants(s) for which DOE have a contractual obligation Ethan Bio-Fuels PLC
The operational/applicant entity working on this project has decided to make the Project Design Document (PDD) publicly available directly on the UNFCCC CDM website.
POA-DD POA-DD (1083 KB)
Local stakeholder consultation report: N/A
Impact assessment summary: N/A
CPA-DD Not Applicable
Specific CPA-DD
Ethiopia Move PoA DD 0908 generic CPA (1083 KB)
Proposed CP start date: 30 Aug 2018 Length of CP: 07
Submission of comments to the DOE/AE
The comment period is over.
No comments received.
* Emission reductions in metric tonnes of CO2 equivalent per annum that are based on the estimates provided by the project participants in unvalidated PDDs