Programme of Activity for renewable energy growth in Asian countries
Host party(ies) Indonesia
Cambodia
Lao People's Democratic Republic
Sri Lanka
Philippines
Thailand
Viet Nam
Methodology(ies) AMS-I.D. ver. 18
ACM0002 ver. 20
Standardised Baselines N/A
Estimated total annual GHG emission reductions or removal enhancements of all specific-case CPAs 1
DOE/AE Bureau Veritas India Pvt. Ltd.
Coordinating and managing entity (CME) The Blue Circle Pte Ltd
Period for comments 07 Jul 21 - 05 Aug 21 (23:59:59 GMT)
Project Participants(s) for which DOE have a contractual obligation The Blue Circle Pte Ltd
The operational/applicant entity working on this project has decided to make the Project Design Document (PDD) publicly available directly on the UNFCCC CDM website.
POA-DD POA-DD (1133 KB)
Local stakeholder consultation report: N/A
Impact assessment summary: N/A
CPA-DD Not Applicable
Specific CPA-DD
Untitled (uploaded 06 Jul 21 12:32:48) (253 KB)
Proposed CP start date: 01 Jan 2022 Length of CP: 10
Untitled (uploaded 06 Jul 21 12:43:56) (253 KB)
Proposed CP start date: 01 Jan 2022 Length of CP: 10
Untitled (uploaded 06 Jul 21 12:43:56) (253 KB)
Proposed CP start date: 01 Jan 2022 Length of CP: 10
Untitled (uploaded 06 Jul 21 12:43:56) (253 KB)
Proposed CP start date: 01 Jan 2022 Length of CP: 10
Untitled (uploaded 06 Jul 21 12:43:58) (253 KB)
Proposed CP start date: 01 Jan 2022 Length of CP: 10
Untitled (uploaded 06 Jul 21 12:43:59) (253 KB)
Proposed CP start date: 01 Jan 2022 Length of CP: 10
Untitled (uploaded 06 Jul 21 12:43:59) (253 KB)
Proposed CP start date: 01 Jan 2022 Length of CP: 10
Submission of comments to the DOE/AE
The comment period is over.
* Emission reductions in metric tonnes of CO2 equivalent per annum that are based on the estimates provided by the project participants in unvalidated PDDs