The Solar United Network South East Asia Pacific (SUNSEAP) Program
Host party(ies) Brunei Darussalam
Indonesia
Cambodia
Lao People's Democratic Republic
Myanmar
Malaysia
Philippines
Singapore
Thailand
Viet Nam
Methodology(ies) AMS-I.F. ver. 3
ACM0002 ver. 19
AMS-I.D. ver. 18
Standardised Baselines N/A
Estimated total annual GHG emission reductions or removal enhancements of all specific-case CPAs 219,564
DOE/AE Carbon Check (India) Private Ltd.
Coordinating and managing entity (CME) Climate Resources Exchange International Pte Ltd
Period for comments 14 Feb 19 - 15 Mar 19 (23:59:59 GMT)
Project Participants(s) for which DOE have a contractual obligation Climate Resources Exchange International Pte Ltd
The operational/applicant entity working on this project has decided to make the Project Design Document (PDD) publicly available directly on the UNFCCC CDM website.
POA-DD POA-DD (1284 KB)
Local stakeholder consultation report: N/A
Impact assessment summary: N/A
CPA-DD Not Applicable
Specific CPA-DD
PoA-DD-(CRX-Edit V3) (1284 KB)
Proposed CP start date: 30 May 2019 Length of CP: 7
PoA-DD-VN168(CC comments-CCIPL)(CRX-Edit V3) 3 (1284 KB)
Proposed CP start date: 30 May 2019 Length of CP: 7
PoA-DD-VN168(CC comments-CCIPL)(CRX-Edit V3) 5 (1284 KB)
Proposed CP start date: 30 May 2019 Length of CP: 7
PoA-DD-VN168(CC comments-CCIPL)(CRX-Edit V3) 4 (1284 KB)
Proposed CP start date: 30 May 2019 Length of CP: 7
PoA-DD-VN168(CC comments-CCIPL)(CRX-Edit V3) 6 (1284 KB)
Proposed CP start date: 30 May 2019 Length of CP: 7
PoA-DD-VN168(CC comments-CCIPL)(CRX-Edit V3) 7 (1284 KB)
Proposed CP start date: 30 May 2019 Length of CP: 7
PoA-DD-VN168(CC comments-CCIPL)(CRX-Edit V3) 8 (1284 KB)
Proposed CP start date: 30 May 2019 Length of CP: 7
PoA-DD-VN168(CC comments-CCIPL)(CRX-Edit V3) 9 (1284 KB)
Proposed CP start date: 30 May 2019 Length of CP: 7
PoA-DD-VN168(CC comments-CCIPL)(CRX-Edit V3)2 (1284 KB)
Proposed CP start date: 30 May 2019 Length of CP: 7
PoA-DD-VN168(CC comments-CCIPL)(CRX-Edit V3) (1284 KB)
Proposed CP start date: 30 May 2019 Length of CP: 7
Submission of comments to the DOE/AE
The comment period is over.
No comments received.
* Emission reductions in metric tonnes of CO2 equivalent per annum that are based on the estimates provided by the project participants in unvalidated PDDs