EGE Haina Solar Project
Host party(ies) Dominican Republic
Methodology(ies) ACM0002 ver. 20
Standardised Baselines N/A
Estimated total annual GHG emission reductions or removal enhancements of all specific-case CPAs 381,259
DOE/AE Earthood Services Private Limited
Coordinating and managing entity (CME) Empresa Generadora de Electricidad Haina (EGE Haina S.A.)
Period for comments 05 May 20 - 03 Jun 20 (23:59:59 GMT)
Project Participants(s) for which DOE have a contractual obligation Empresa Generadora de Electricidad Haina (EGE Haina S.A.)
The operational/applicant entity working on this project has decided to make the Project Design Document (PDD) publicly available directly on the UNFCCC CDM website.
POA-DD POA-DD (727 KB)
Local stakeholder consultation report: N/A
Impact assessment summary: N/A
CPA-DD Not Applicable
Specific CPA-DD
CPA-DD Solare DR (727 KB)
Proposed CP start date: 04 May 2020 Length of CP: 7
Submission of comments to the DOE/AE
The comment period is over.
* Emission reductions in metric tonnes of CO2 equivalent per annum that are based on the estimates provided by the project participants in unvalidated PDDs