Zhongying Changjiang Small-scale Hydropower Programme of Activities
Host party(ies) China
Methodology(ies) AMS-I.D. ver. 17
Standardised Baselines N/A
Estimated total annual GHG emission reductions or removal enhancements of all specific-case CPAs 22,001
DOE/AE China Environmental United Certification Center Co., Ltd.
Period for comments 27 Apr 12 - 26 May 12
The operational/applicant entity working on this project has decided to make the Project Design Document (PDD) publicly available directly on the UNFCCC CDM website.
POA-DD POA-DD (855 KB)
Local stakeholder consultation report: N/A
Impact assessment summary: N/A
CPA-DD CPA-DD (655 KB)
Specific CPA-DD Specific CPA-DD (677 KB)
Submission of comments to the DOE/AE
The comment period is over.
* Emission reductions in metric tonnes of CO2 equivalent per annum that are based on the estimates provided by the project participants in unvalidated PDDs