GHG Programme - N2O Technologies Group2
Host party(ies) Mozambique
Methodology(ies) AM0021 ver. 3
Standardised Baselines ASB0040-2018 ver. 01.0 - Standardized baseline: Grid emission factor for the Southern African power pool
Estimated total annual GHG emission reductions or removal enhancements of all specific-case CPAs 1
DOE/AE EPIC Sustainability Services Pvt. Ltd.
Coordinating and managing entity (CME) Kanaka Management Services Private Limited
Period for comments 05 Aug 20 - 03 Sep 20 (23:59:59 GMT)
Project Participants(s) for which DOE have a contractual obligation Kanaka Management Services Private Limited
The operational/applicant entity working on this project has decided to make the Project Design Document (PDD) publicly available directly on the UNFCCC CDM website.
POA-DD POA-DD (489 KB)
Local stakeholder consultation report: N/A
Impact assessment summary: N/A
CPA-DD Not Applicable
Specific CPA-DD
CPA DD N2O technologies group 2 (489 KB)
Proposed CP start date: 04 Aug 2020 Length of CP: 07
Submission of comments to the DOE/AE
The comment period is over.
No comments received.
* Emission reductions in metric tonnes of CO2 equivalent per annum that are based on the estimates provided by the project participants in unvalidated PDDs