Mali Rural Electrification Program
Host party(ies) Mali
Methodology(ies) AMS-III.AR. ver. 5
AMS-III.BL.
Standardised Baselines N/A
Estimated total annual GHG emission reductions or removal enhancements of all specific-case CPAs 49,678
DOE/AE TÜV NORD CERT GmbH
Coordinating and managing entity (CME) Agence Malienne pour le Développement de l'Energie Domestique et de l'Electrification rurale (AMADER)
Period for comments 11 Aug 16 - 09 Sep 16 (23:59:59 GMT)
Project Participants(s) for which DOE have a contractual obligation International Bank for Reconstruction and Development (IBRD) as trustee of the Carbon Initiative for Development (Ci-Dev)
The operational/applicant entity working on this project has decided to make the Project Design Document (PDD) publicly available directly on the UNFCCC CDM website.
POA-DD POA-DD (1225 KB)
Local stakeholder consultation report: N/A
Impact assessment summary: N/A
CPA-DD Not Applicable
Specific CPA-DD
16/099 Hybrid MiniGrid CPA01 (691 KB)
Proposed CP start date: 01 Nov 2016 Length of CP: 10
16/099 Hybrid MiniGrid CPA02 (691 KB)
Proposed CP start date: 01 Nov 2016 Length of CP: 10
16/099 Hybrid MiniGrid CPA03 (690 KB)
Proposed CP start date: 01 Nov 2016 Length of CP: 10
16/099 Solar Lamp CPA1 (389 KB)
Proposed CP start date: 01 Nov 2016 Length of CP: 7
Submission of comments to the DOE/AE
The comment period is over.
No comments received.
* Emission reductions in metric tonnes of CO2 equivalent per annum that are based on the estimates provided by the project participants in unvalidated PDDs