Clean bricks production in Nepal
Host party(ies) Nepal
Methodology(ies) AMS-III.Z. ver. 6
Standardised Baselines N/A
Estimated total annual GHG emission reductions or removal enhancements of all specific-case CPAs 1
DOE/AE KBS Certification Services Limited
Coordinating and managing entity (CME) Ecoeye Co., Ltd.
Period for comments 07 Nov 20 - 06 Dec 20 (23:59:59 GMT)
Project Participants(s) for which DOE have a contractual obligation Ecoeye Co., Ltd.
The operational/applicant entity working on this project has decided to make the Project Design Document (PDD) publicly available directly on the UNFCCC CDM website.
POA-DD POA-DD (989 KB)
Local stakeholder consultation report: N/A
Impact assessment summary: N/A
CPA-DD Not Applicable
Specific CPA-DD
PoA DD (989 KB)
Proposed CP start date: 25 Dec 2020 Length of CP: 10
Submission of comments to the DOE/AE
The comment period is over.
No comments received.
* Emission reductions in metric tonnes of CO2 equivalent per annum that are based on the estimates provided by the project participants in unvalidated PDDs