National Programme for Energy Efficiency Improvement in the Brick Manufacturing Sector in Bangladesh
Host party(ies) Bangladesh
Methodology(ies) AMS-III.Z. ver. 6
Standardised Baselines N/A
Estimated total annual GHG emission reductions or removal enhancements of all specific-case CPAs 19,666
DOE/AE EPIC Sustainability Services Pvt. Ltd.
Coordinating and managing entity (CME) Future Carbon Energy Services
Period for comments 05 Oct 16 - 03 Nov 16 (23:59:59 GMT)
Project Participants(s) for which DOE have a contractual obligation Future Carbon Energy Services
The operational/applicant entity working on this project has decided to make the Project Design Document (PDD) publicly available directly on the UNFCCC CDM website.
POA-DD POA-DD (1502 KB)
Local stakeholder consultation report: N/A
Impact assessment summary: N/A
CPA-DD Not Applicable
Specific CPA-DD
CPA PDD_Bangladesh_V1.1 - Copy (1051 KB)
Proposed CP start date: 05 Oct 2016 Length of CP: 21
Submission of comments to the DOE/AE
The comment period is over.
No comments received.
* Emission reductions in metric tonnes of CO2 equivalent per annum that are based on the estimates provided by the project participants in unvalidated PDDs