23:13 07 Nov 25
Project:
8239 African Clean Energy Switch – Biogas (ACES-Biogas)
- Request for post-registration changes
| Project | 8239 African Clean Energy Switch – Biogas (ACES-Biogas) |
|---|---|
| PRC ref | PRC-8239-001 |
| Process track | Renewal |
| DOE | AENOR |
|
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes |
Change a methodology (including addition of methodology(ies)) |
| Methodology(ies) list |
AMS-I.I. ver. 4 -
Biogas/biomass thermal applications for households/small users
AMS-III.R. ver. 3 - Methane recovery in agricultural activities at household/small farm level |
| Standardized baseline(s) list | |
| DOE conducted validation of the changes | Combined with a request for renewal of crediting period (See footnote 2 below) |
| Type of submission |
Corrections that do not affect project design
Changes to the project or programme design
|
| Applicable crediting period | 24 Dec 19 - 23 Dec 26 |
| Assessment opinion |
Assessment opinion (339 KB)
|
| Revised PDD |
Revised PDD - track changes (1196 KB)
|
| Supplementary documents | |
| Signed form |
Signed form (150 KB)
|
| DOE clarification | |
| VVS version | VVS-PoA 2.0 |
| Current status | 30 Dec 20 -
Approved
Effective approval date: 30 Dec 20
|
| Historic statuses |
25 Nov 20 -
Request published |

Assessment opinion
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: