18:47 22 Nov 24
Project:
0735 La Vuelta and La Herradura Hydroelectric Project
- Request for post-registration changes
Project | 0735 La Vuelta and La Herradura Hydroelectric Project |
---|---|
PRC ref | PRC-0735-001 |
Process track | Prior approval |
DOE | ICONTEC |
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes |
|
Methodology(ies) list | |
Standardized baseline(s) list | |
DOE conducted validation of the changes | Prior to commencement of a verification for the project activity or PoA stated above |
Type of submission |
Corrections that do not affect project design
Changes to the project or programme design
|
Applicable crediting period | 01 Jan 05 - 31 Dec 11 |
Assessment opinion | Assessment opinion (221 KB) |
Revised PDD | Revised PDD (974 KB) Revised PDD - track changes (977 KB) |
Supplementary documents |
Appendix 1 - NPV-LVLH (10Mar14).xlsx (19 KB)
|
Signed form | Signed form (972 KB) |
DOE clarification | |
VVS version | VVS 2.0 |
Current status | 20 May 14 -
Approved
Effective approval date: 20 May 14
|
Historic statuses |
15 Apr 14 -
Published 15 Apr 14 - Summary note being prepared 29 Apr 14 - Awaiting EB decision |
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: