Project: 0735 La Vuelta and La Herradura Hydroelectric Project - Request for post-registration changes
Project 0735 La Vuelta and La Herradura Hydroelectric Project
PRC ref PRC-0735-001
Process track Prior approval
DOE ICONTEC
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes Prior to commencement of a verification for the project activity or PoA stated above
Type of submission Corrections that do not affect project design
  • All changes are in Appendix 1 of the CDM project standard? Yes

Changes to the project or programme design
  • Changes have an impact on: None of the above
Applicable crediting period 01 Jan 05 - 31 Dec 11
Assessment opinion Assessment opinion (221 KB)
Revised PDD Revised PDD (974 KB)   Revised PDD - track changes (977 KB)
Supplementary documents Appendix 1 - NPV-LVLH (10Mar14).xlsx (19 KB)
Signed form Signed form (972 KB)
DOE clarification
VVS version VVS 2.0
Current status 20 May 14 - Approved
Effective approval date: 20 May 14
Historic statuses 15 Apr 14 - Published
15 Apr 14 - Summary note being prepared
29 Apr 14 - Awaiting EB decision