16:20 13 Nov 25
Project:
0735 La Vuelta and La Herradura Hydroelectric Project
- Request for post-registration changes
| Project | 0735 La Vuelta and La Herradura Hydroelectric Project |
|---|---|
| PRC ref | PRC-0735-001 |
| Process track | Prior approval |
| DOE | ICONTEC |
|
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes |
|
| Methodology(ies) list | |
| Standardized baseline(s) list | |
| DOE conducted validation of the changes | Prior to commencement of a verification for the project activity or PoA stated above |
| Type of submission |
Corrections that do not affect project design
Changes to the project or programme design
|
| Applicable crediting period | 01 Jan 05 - 31 Dec 11 |
| Assessment opinion |
Assessment opinion (221 KB)
|
| Revised PDD |
Revised PDD (974 KB)
Revised PDD - track changes (977 KB)
|
| Supplementary documents |
Appendix 1 - NPV-LVLH (10Mar14).xlsx (19 KB)
|
| Signed form |
Signed form (972 KB)
|
| DOE clarification | |
| VVS version | VVS 2.0 |
| Current status | 20 May 14 -
Approved
Effective approval date: 20 May 14
|
| Historic statuses |
15 Apr 14 -
Published 15 Apr 14 - Summary note being prepared 29 Apr 14 - Awaiting EB decision |

Assessment opinion
Appendix 1 - NPV-LVLH (10Mar14).xlsx
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: