Project: 6360 Baner Sangam small hydro power project - Request for post-registration changes
Project 6360 Baner Sangam small hydro power project
PRC ref PRC-6360-001
Process track Issuance
DOE LGAI Tech. Center S.A
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes When performing a verification for the project activity or PoA stated above (See footnote 1 below)
Type of submission Corrections that do not affect project design
  • All changes are in Appendix 1 of the CDM project standard?

Permanent changes from the monitoring plan or the monitoring methodology
  • All changes are in Appendix 1 of the CDM project standard? Yes
Applicable crediting period 01 Oct 13 - 30 Sep 20
Assessment opinion Assessment opinion (352 KB)
Revised PDD Revised PDD (1218 KB)   Revised PDD - track changes (1224 KB)
Supplementary documents
Signed form Signed form (196 KB)
DOE clarification
VVS version VVS-PA 3.0
Current status 02 Sep 25 - Approved
Effective approval date: 02 Sep 25
Historic statuses 04 Aug 25 - Request published