06:11 06 Jan 25
Project:
5567 Inner Mongolia Beijing Energy Shangdu Jiqingliang Wind Farm II
- Request for post-registration changes
Project | 5567 Inner Mongolia Beijing Energy Shangdu Jiqingliang Wind Farm II |
---|---|
PRC ref | PRC-5567-002 |
Process track | Renewal |
DOE | CCCI |
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes |
Change a version of methodology |
Methodology(ies) list |
ACM0002 ver. 19 -
Grid-connected electricity generation from renewable sources
|
Standardized baseline(s) list | |
DOE conducted validation of the changes | Combined with a request for renewal of crediting period (See footnote 2 below) |
Type of submission |
Permanent changes from the monitoring plan or the monitoring methodology
|
Applicable crediting period | 03 Jan 19 - 02 Jan 26 |
Assessment opinion | Assessment opinion (608 KB) |
Revised PDD | Revised PDD - track changes (1805 KB) |
Supplementary documents |
Appendix 1 - ER spreadsheet_5567-Inner Mongolia Beijing Energy Shangdu Jiqingliang Wind Farm II.xls (29 KB)
Appendix 2 - List of documents submitted2_Inner Mongolia Beijing Energy Shangdu Jiqingliang Wind Farm II.pdf (212 KB) |
Signed form | Signed form (100 KB) |
DOE clarification | |
VVS version | VVS-PA 2.0 |
Current status | 03 Jul 19 -
Approved
Effective approval date: 03 Jul 19
|
Historic statuses |
04 Jun 19 -
Request published |
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: