Project: 5567 Inner Mongolia Beijing Energy Shangdu Jiqingliang Wind Farm II - Request for post-registration changes
Project 5567 Inner Mongolia Beijing Energy Shangdu Jiqingliang Wind Farm II
PRC ref PRC-5567-002
Process track Renewal
DOE CCCI
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
Change a version of methodology
Methodology(ies) list ACM0002 ver. 19 - Grid-connected electricity generation from renewable sources
Standardized baseline(s) list
DOE conducted validation of the changes Combined with a request for renewal of crediting period (See footnote 2 below)
Type of submission Permanent changes from the monitoring plan or the monitoring methodology
  • All changes are in Appendix 1 of the CDM project standard? Yes
Applicable crediting period 03 Jan 19 - 02 Jan 26
Assessment opinion Assessment opinion (608 KB)
Revised PDD   Revised PDD - track changes (1805 KB)
Supplementary documents Appendix 1 - ER spreadsheet_5567-Inner Mongolia Beijing Energy Shangdu Jiqingliang Wind Farm II.xls (29 KB)
Appendix 2 - List of documents submitted2_Inner Mongolia Beijing Energy Shangdu Jiqingliang Wind Farm II.pdf (212 KB)
Signed form Signed form (100 KB)
DOE clarification
VVS version VVS-PA 2.0
Current status 03 Jul 19 - Approved
Effective approval date: 03 Jul 19
Historic statuses 04 Jun 19 - Request published