Project: 5090 Renewable Energy Wind Power Project in Rajasthan - Request for post-registration changes
Project 5090 Renewable Energy Wind Power Project in Rajasthan
PRC ref PRC-5090-002
Process track Prior approval
DOE SGS
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes When performing a verification for the project activity or PoA stated above (See footnote 1 below)
Type of submission Corrections that do not affect project design
  • All changes are in Appendix 1 of the CDM project standard? Yes

Permanent changes from the monitoring plan or the monitoring methodology
  • All changes are in Appendix 1 of the CDM project standard? No
Applicable crediting period 28 Feb 12 - 27 Feb 22
Assessment opinion Assessment opinion (243 KB)
Revised PDD Revised PDD (2217 KB)   Revised PDD - track changes (2545 KB)
Supplementary documents Appendix 1 - Upload Information for Documents CDM.VER1424.pdf (14 KB)
Signed form Signed form (34 KB)
DOE clarification
VVS version VVS 2.0
Current status 21 Oct 14 - Approved
Effective approval date: 23 Sep 14
Historic statuses 19 Aug 14 - Published
19 Aug 14 - Summary note being prepared
02 Sep 14 - Awaiting EB decision