07:43 28 Dec 24
Project:
5090 Renewable Energy Wind Power Project in Rajasthan
- Request for post-registration changes
Project | 5090 Renewable Energy Wind Power Project in Rajasthan |
---|---|
PRC ref | PRC-5090-002 |
Process track | Prior approval |
DOE | SGS |
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes |
|
Methodology(ies) list | |
Standardized baseline(s) list | |
DOE conducted validation of the changes | When performing a verification for the project activity or PoA stated above (See footnote 1 below) |
Type of submission |
Corrections that do not affect project design
Permanent changes from the monitoring plan or the monitoring methodology
|
Applicable crediting period | 28 Feb 12 - 27 Feb 22 |
Assessment opinion | Assessment opinion (243 KB) |
Revised PDD | Revised PDD (2217 KB) Revised PDD - track changes (2545 KB) |
Supplementary documents |
Appendix 1 - Upload Information for Documents CDM.VER1424.pdf (14 KB)
|
Signed form | Signed form (34 KB) |
DOE clarification | |
VVS version | VVS 2.0 |
Current status | 21 Oct 14 -
Approved
Effective approval date: 23 Sep 14
|
Historic statuses |
19 Aug 14 -
Published 19 Aug 14 - Summary note being prepared 02 Sep 14 - Awaiting EB decision |
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: