Project: 10368 Grid-connected Solar PV project in Mérina Dakhar - Request for post-registration changes
Project 10368 Grid-connected Solar PV project in Mérina Dakhar
PRC ref PRC-10368-002
Process track Prior approval
DOE Carbon Check
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes When performing a verification for the project activity or PoA stated above (See footnote 1 below)
Type of submission Permanent changes from the monitoring plan or the monitoring methodology
  • All changes are in Appendix 1 of the CDM project standard? No
Applicable crediting period 20 Nov 17 - 19 Nov 24
Assessment opinion Assessment opinion (744 KB)
Revised PDD Revised PDD (1303 KB)   Revised PDD - track changes (1371 KB)
Supplementary documents
Signed form Signed form (2519 KB)
DOE clarification DOE clarification 1 - 190525 - PDD - MERINA_Clean.pdf (1371 KB)
DOE clarification 2 - 190525 - PDD - MERINA_TC.pdf (1617 KB)
DOE clarification 3 - CCIPL 606 PRC FVR (clean).pdf (1687 KB)
DOE clarification 4 - CCIPL 606 PRC FVR (tc).pdf (1706 KB)
VVS version VVS-PA 2.0
Current status 03 Jul 19 - Approved
Effective approval date: 02 Jul 19
Historic statuses 29 Apr 19 - Published
15 May 19 - Awaiting DOE clarifications
29 May 19 - DOE clarifications received
29 May 19 - Summary note being prepared
12 Jun 19 - Awaiting EB decision