Project: 1134 ESTRE Pedreira Landfill Gás Project (EPLGP) - Request for post-registration changes
Project 1134 ESTRE Pedreira Landfill Gás Project (EPLGP)
PRC ref PRC-1134-002
Process track Issuance
DOE EPIC
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
No changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes When performing a verification for the project activity or PoA stated above (See footnote 1 below)
Type of submission Corrections that do not affect project design
  • All changes are in Appendix 1 of the CDM project standard?
Applicable crediting period 12 Feb 15 - 11 Feb 22
Assessment opinion Assessment opinion (617 KB)
Revised PDD Revised PDD (2177 KB)   Revised PDD - track changes (2651 KB)
Supplementary documents Appendix 1 - CDR Pedreira 2nd CP CER spreasheet_v6.0_05.07.2021.xlsx (274 KB)
Signed form Signed form (249 KB)
DOE clarification
VVS version VVS-PA 2.0
Current status 16 Sep 21 - Approved
Effective approval date: 16 Sep 21
Historic statuses 18 Aug 21 - Request published