12:45 20 Jan 26
Project:
1134 ESTRE Pedreira Landfill Gás Project (EPLGP)
- Request for post-registration changes
| Project | 1134 ESTRE Pedreira Landfill Gás Project (EPLGP) |
|---|---|
| PRC ref | PRC-1134-002 |
| Process track | Issuance |
| DOE | EPIC |
|
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes |
No changes |
| Methodology(ies) list | |
| Standardized baseline(s) list | |
| DOE conducted validation of the changes | When performing a verification for the project activity or PoA stated above (See footnote 1 below) |
| Type of submission |
Corrections that do not affect project design
|
| Applicable crediting period | 12 Feb 15 - 11 Feb 22 |
| Assessment opinion |
Assessment opinion (617 KB)
|
| Revised PDD |
Revised PDD (2177 KB)
Revised PDD - track changes (2651 KB)
|
| Supplementary documents |
Appendix 1 - CDR Pedreira 2nd CP CER spreasheet_v6.0_05.07.2021.xlsx (274 KB)
|
| Signed form |
Signed form (249 KB)
|
| DOE clarification | |
| VVS version | VVS-PA 2.0 |
| Current status | 16 Sep 21 -
Approved
Effective approval date: 16 Sep 21
|
| Historic statuses |
18 Aug 21 -
Request published |

Assessment opinion
Appendix 1 - CDR Pedreira 2nd CP CER spreasheet_v6.0_05.07.2021.xlsx
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: