Project:
3585 Grid-connected Electricity Generation from Biomass at Advance Biopower
- Request for post-registration changes
| Project | 3585 Grid-connected Electricity Generation from Biomass at Advance Biopower |
|---|---|
| PRC ref | PRC-3585-001 |
| Process track | Issuance |
| DOE | DNV |
|
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes |
|
| Methodology(ies) list | |
| Standardized baseline(s) list | |
| DOE conducted validation of the changes | When performing a verification for the project activity or PoA stated above (See footnote 1 below) |
| Type of submission |
Corrections that do not affect project design
|
| Applicable crediting period | 23 Dec 11 - 22 Dec 18 |
| Assessment opinion |
Assessment opinion (108 KB)
|
| Revised PDD |
Revised PDD (421 KB)
Revised PDD - track changes (378 KB)
|
| Supplementary documents | |
| Signed form |
Signed form (152 KB)
|
| DOE clarification | |
| VVS version | VVS 2.0 |
| Current status | 27 Sep 13 -
Approved
Effective approval date: 27 Sep 13
|
| Historic statuses |
29 Aug 13 -
Request published |

Assessment opinion