Project: 0916 Methane Recovery and Utilisation Project at TSH Kunak Oil Palm Mill - Request for post-registration changes
Project 0916 Methane Recovery and Utilisation Project at TSH Kunak Oil Palm Mill
PRC ref PRC-0916-001
Process track Prior approval
DOE TÜV NORD
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes Prior to commencement of a verification for the project activity or PoA stated above
Type of submission Corrections that do not affect project design
  • All changes are in Appendix 1 of the CDM project standard? No

Permanent changes from the monitoring plan or the monitoring methodology
  • All changes are in Appendix 1 of the CDM project standard? No
Applicable crediting period 01 Dec 08 - 30 Nov 15
Assessment opinion Assessment opinion (431 KB)
Revised PDD Revised PDD (686 KB)   Revised PDD - track changes (735 KB)
Supplementary documents Appendix 1 - 0916 2 CH4 Baseline Calculation_revised.xls (106 KB)
Appendix 2 - 0916 2 Incident Summary Codel instrument.xlsx (15 KB)
Signed form Signed form (93 KB)
DOE clarification
VVS version VVS 2.0
Current status 07 Oct 13 - Approved
Effective approval date: 03 Oct 13
Historic statuses 16 Aug 13 - Published
30 Aug 13 - Awaiting DOE clarifications
11 Sep 13 - DOE clarifications received
11 Sep 13 - Summary note being prepared
12 Sep 13 - Awaiting EB decision