Project: 9394 Double A Ethanol wastewater treatment plant - Request for post-registration changes
Project 9394 Double A Ethanol wastewater treatment plant
PRC ref PRC-9394-001
Process track Prior approval
DOE KBS
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
No changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes Prior to commencement of a verification for the project activity or PoA stated above
Type of submission Corrections that do not affect project design
  • All changes are in Appendix 1 of the CDM project standard?

Permanent changes from the monitoring plan or the monitoring methodology
  • All changes are in Appendix 1 of the CDM project standard? No

Changes to the project or programme design
  • Changes have an impact on: Addition of new components or extension/addition of technologies/measures that introduce:
Applicable crediting period 01 Apr 14 - 31 Mar 24
Assessment opinion Assessment opinion (293 KB)
Revised PDD Revised PDD (1690 KB)   Revised PDD - track changes (1691 KB)
Supplementary documents Appendix 1 - AAe_ER_version 4_18.12.2017.xlsx (371 KB)
Signed form Signed form (162 KB)
DOE clarification
VVS version VVS-PA 1.0
Current status 19 Feb 18 - Approved
Effective approval date: 18 Feb 18
Historic statuses 15 Jan 18 - Published
15 Jan 18 - Summary note being prepared
29 Jan 18 - Awaiting EB decision