Project:
0953 Birahi Ganga Hydro Electric Project
- Request for post-registration changes
| Project | 0953 Birahi Ganga Hydro Electric Project |
|---|---|
| PRC ref | PRC-0953-001 |
| Process track | Prior approval |
| DOE | TUV RHEIN |
|
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes |
|
| Methodology(ies) list | |
| Standardized baseline(s) list | |
| DOE conducted validation of the changes | Prior to commencement of a verification for the project activity or PoA stated above |
| Type of submission |
Corrections that do not affect project design
Changes to the project or programme design
Change to the start date of the crediting period
|
| Applicable crediting period | 31 Dec 09 - 30 Dec 16 |
| Assessment opinion |
Assessment opinion (586 KB)
|
| Revised PDD |
Revised PDD (743 KB)
Revised PDD - track changes (758 KB)
|
| Supplementary documents |
Appendix 1 - ER Estimations -BGHEP - CSD FINAL - 03042013.xls (40 KB)
|
| Signed form |
Signed form (951 KB)
|
| DOE clarification |
DOE clarification 1 - Clarification response _ Birahi.pdf (211 KB)
|
| VVS version | VVS 2.0 |
| Current status | 17 Oct 13 -
Approved
Effective approval date: 16 Oct 13
|
| Historic statuses |
06 Aug 13 -
Published 22 Aug 13 - Awaiting DOE clarifications 05 Sep 13 - DOE clarifications received 05 Sep 13 - Summary note being prepared 25 Sep 13 - Awaiting EB decision |

Assessment opinion
Appendix 1 - ER Estimations -BGHEP - CSD FINAL - 03042013.xls
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: