Project: 0953 Birahi Ganga Hydro Electric Project - Request for post-registration changes
Project 0953 Birahi Ganga Hydro Electric Project
PRC ref PRC-0953-001
Process track Prior approval
DOE TUV RHEIN
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes Prior to commencement of a verification for the project activity or PoA stated above
Type of submission Corrections that do not affect project design
  • All changes are in Appendix 1 of the CDM project standard? Yes

Changes to the project or programme design
  • Changes have an impact on:

Change to the start date of the crediting period
  • Proposed start date of crediting period: 31 Dec 2009
Applicable crediting period 31 Dec 09 - 30 Dec 16
Assessment opinion Assessment opinion (586 KB)
Revised PDD Revised PDD (743 KB)   Revised PDD - track changes (758 KB)
Supplementary documents Appendix 1 - ER Estimations -BGHEP - CSD FINAL - 03042013.xls (40 KB)
Signed form Signed form (951 KB)
DOE clarification DOE clarification 1 - Clarification response _ Birahi.pdf (211 KB)
VVS version VVS 2.0
Current status 17 Oct 13 - Approved
Effective approval date: 16 Oct 13
Historic statuses 06 Aug 13 - Published
22 Aug 13 - Awaiting DOE clarifications
05 Sep 13 - DOE clarifications received
05 Sep 13 - Summary note being prepared
25 Sep 13 - Awaiting EB decision