Project: 9265 Top Third Ventures Stove Programme - Request for post-registration changes
Project 9265 Top Third Ventures Stove Programme
PRC ref PRC-9265-004
Process track Renewal
DOE KBS
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
Change a methodology (including addition of methodology(ies))
Methodology(ies) list AMS-I.E. ver. 10 - Switch from non-renewable biomass for thermal applications by the user
AMS-II.G. ver. 11 - Energy efficiency measures in thermal applications of non-renewable biomass
Standardized baseline(s) list
DOE conducted validation of the changes Combined with a request for renewal of crediting period (See footnote 2 below)
Type of submission Corrections that do not affect project design
  • All changes are in Appendix 1 of the CDM project standard?

Permanent changes from the monitoring plan or the monitoring methodology
  • All changes are in Appendix 1 of the CDM project standard? No

Addition of specific case CPA DDs corresponding to generic CPA DDs

Changes to the project or programme design
  • Changes have an impact on: Addition or change of technologies/measures with or without addition or change of applied methodologies, A revision to the eligibility criteria pertaining to the demonstration of additionality, Voluntary update of the applied methodologies or the other applied methodological regulatory documents to a later valid version or voluntary change to other methodologies
Applicable crediting period 27 Dec 19 - 26 Dec 26
Assessment opinion Assessment opinion (1210 KB)
Revised PDD   Revised PDD - track changes (7338 KB)
Supplementary documents Appendix 1 - 20200619_Top Third PoA-DD renewal_v3.2_clean.pdf (6751 KB)
Signed form Signed form (248 KB)
DOE clarification
VVS version VVS-PoA 2.0
Current status 15 Oct 20 - Approved
Effective approval date: 15 Oct 20
Historic statuses 16 Sep 20 - Request published