Project: 0878 Hebei Kangbao Wolongtushan 30 MW Wind Farm Project - Request for post-registration changes
Project 0878 Hebei Kangbao Wolongtushan 30 MW Wind Farm Project
PRC ref PRC-0878-001
Process track Issuance
DOE SGS
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes When performing a verification for the project activity or PoA stated above (See footnote 1 below)
Type of submission Corrections that do not affect project design
  • All changes are in Appendix 1 of the CDM project standard? Yes
Applicable crediting period 15 Apr 07 - 14 Apr 14
Assessment opinion Assessment opinion (443 KB)
Revised PDD Revised PDD (390 KB)   Revised PDD - track changes (525 KB)
Supplementary documents
Signed form Signed form (1474 KB)
DOE clarification
VVS version VVS 2.0
Current status 27 Dec 12 - Approved
Effective approval date: 27 Dec 12
Historic statuses 28 Nov 12 - Request published