Project: 7537 Clean Energy Project in the State of Tamil Nadu - Request for post-registration changes
Project 7537 Clean Energy Project in the State of Tamil Nadu
PRC ref PRC-7537-002
Process track Prior approval
DOE SGS
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes When performing a verification for the project activity or PoA stated above (See footnote 1 below)
Type of submission Corrections that do not affect project design
  • All changes are in Appendix 1 of the CDM project standard? Yes

Permanent changes from the monitoring plan or the monitoring methodology
  • All changes are in Appendix 1 of the CDM project standard? No

Changes to the project or programme design
  • Changes have an impact on: None of the above
Applicable crediting period 06 Dec 12 - 05 Dec 22
Assessment opinion Assessment opinion (586 KB)
Revised PDD Revised PDD (799 KB)   Revised PDD - track changes (1055 KB)
Supplementary documents Appendix 1 - Upload Information for Documents.pdf (90 KB)
Appendix 2 - Investment Analysis_07.10.2014.xlsx.zip (52 KB)
Signed form Signed form (37 KB)
DOE clarification
VVS version VVS 2.0
Current status 05 Jan 15 - Approved
Effective approval date: 23 Dec 14
Historic statuses 18 Nov 14 - Published
18 Nov 14 - Summary note being prepared
02 Dec 14 - Awaiting EB decision