Project: 7221 Hangjin Yihewusu Phase I 49.5MW Wind Power Project - Request for post-registration changes
Project 7221 Hangjin Yihewusu Phase I 49.5MW Wind Power Project
PRC ref PRC-7221-001
Process track Issuance
DOE LGAI Tech. Center S.A
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
No changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes When performing a verification for the project activity or PoA stated above (See footnote 1 below)
Type of submission Corrections that do not affect project design
  • All changes are in Appendix 1 of the CDM project standard? Yes

Permanent changes from the monitoring plan or the monitoring methodology
  • All changes are in Appendix 1 of the CDM project standard? Yes
Applicable crediting period 07 Sep 12 - 06 Sep 19
Assessment opinion Assessment opinion (272 KB)
Revised PDD Revised PDD (1450 KB)   Revised PDD - track changes (1465 KB)
Supplementary documents
Signed form Signed form (184 KB)
DOE clarification
VVS version VVS 7.0
Current status 17 Apr 15 - Approved
Effective approval date: 17 Apr 15
Historic statuses 19 Mar 15 - Request published