Project: 4248 Gansu Xinmintan 10MW Expanded Hydropower Project - Request for post-registration changes
Project 4248 Gansu Xinmintan 10MW Expanded Hydropower Project
PRC ref PRC-4248-001
Process track Issuance
DOE JCI
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes When performing a verification for the project activity or PoA stated above (See footnote 1 below)
Type of submission Corrections that do not affect project design
  • All changes are in Appendix 1 of the CDM project standard? Yes

Permanent changes from the monitoring plan or the monitoring methodology
  • All changes are in Appendix 1 of the CDM project standard? Yes
Applicable crediting period 17 Dec 11 - 16 Dec 18
Assessment opinion Assessment opinion (768 KB)
Revised PDD Revised PDD (864 KB)   Revised PDD - track changes (683 KB)
Supplementary documents
Signed form Signed form (308 KB)
DOE clarification
VVS version VVS 2.0
Current status 17 Jan 13 - Approved
Effective approval date: 17 Jan 13
Historic statuses 19 Dec 12 - Request published