Project:
4248 Gansu Xinmintan 10MW Expanded Hydropower Project
- Request for post-registration changes
Project | 4248 Gansu Xinmintan 10MW Expanded Hydropower Project |
---|---|
PRC ref | PRC-4248-001 |
Process track | Issuance |
DOE | JCI |
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes |
|
Methodology(ies) list | |
Standardized baseline(s) list | |
DOE conducted validation of the changes | When performing a verification for the project activity or PoA stated above (See footnote 1 below) |
Type of submission |
Corrections that do not affect project design
Permanent changes from the monitoring plan or the monitoring methodology
|
Applicable crediting period | 17 Dec 11 - 16 Dec 18 |
Assessment opinion | Assessment opinion (768 KB) |
Revised PDD | Revised PDD (864 KB) Revised PDD - track changes (683 KB) |
Supplementary documents | |
Signed form | Signed form (308 KB) |
DOE clarification | |
VVS version | VVS 2.0 |
Current status | 17 Jan 13 -
Approved
Effective approval date: 17 Jan 13
|
Historic statuses |
19 Dec 12 -
Request published |