Project: 5388 Hebei Zhangbei Baimiaotan Wind Power Project Phase II - Request for post-registration changes
Project 5388 Hebei Zhangbei Baimiaotan Wind Power Project Phase II
PRC ref PRC-5388-001
Process track Prior approval
DOE LRQA
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes When performing a verification for the project activity or PoA stated above (See footnote 1 below)
Type of submission Permanent changes from the monitoring plan or the monitoring methodology
  • All changes are in Appendix 1 of the CDM project standard? No
Applicable crediting period 08 Apr 12 - 07 Apr 19
Assessment opinion Assessment opinion (83 KB)
Revised PDD Revised PDD (730 KB)   Revised PDD - track changes (649 KB)
Supplementary documents
Signed form Signed form (86 KB)
DOE clarification
VVS version VVS 2.0
Current status 09 Sep 13 - Approved
Effective approval date: 06 Sep 13
Historic statuses 23 Jul 13 - Published
23 Jul 13 - Summary note being prepared
16 Aug 13 - Awaiting EB decision