Project: 7245 Methane Capture and Utilization Project at Asia Palm Oil Mill, Malaysia - Request for post-registration changes
Project 7245 Methane Capture and Utilization Project at Asia Palm Oil Mill, Malaysia
PRC ref PRC-7245-001
Process track Prior approval
DOE Carbon Check
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes Prior to commencement of a verification for the project activity or PoA stated above
Type of submission Permanent changes from the monitoring plan or the monitoring methodology
  • All changes are in Appendix 1 of the CDM project standard? No

Changes to the project or programme design
  • Changes have an impact on: Actual operational parameters differ from the expected parameters

Change to the start date of the crediting period
  • Proposed start date of crediting period: 15 May 2015
Applicable crediting period 15 May 15 - 14 May 25
Assessment opinion Assessment opinion (808 KB)
Revised PDD Revised PDD (1013 KB)   Revised PDD - track changes (1362 KB)
Supplementary documents Appendix 1 - PRC_ex-ante ER_Asia Mil Methane Recovery_WWT.xlsx (440 KB)
Signed form Signed form (6954 KB)
DOE clarification
VVS version VVS-PA 2.0
Current status 28 Sep 20 - Approved
Effective approval date: 27 Sep 20
Historic statuses 24 Aug 20 - Published
24 Aug 20 - Summary note being prepared
07 Sep 20 - Awaiting EB decision