Project: 4970 Dak Mi 4 Hydropower Project, Vietnam - Request for post-registration changes
Project 4970 Dak Mi 4 Hydropower Project, Vietnam
PRC ref PRC-4970-001
Process track Issuance
DOE DTSUS
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes When performing a verification for the project activity or PoA stated above (See footnote 1 below)
Type of submission Corrections that do not affect project design
  • All changes are in Appendix 1 of the CDM project standard? Yes

Permanent changes from the monitoring plan or the monitoring methodology
  • All changes are in Appendix 1 of the CDM project standard? Yes
Applicable crediting period 17 Jan 12 - 16 Jan 19
Assessment opinion Assessment opinion (115 KB)
Revised PDD Revised PDD (1636 KB)   Revised PDD - track changes (1817 KB)
Supplementary documents
Signed form Signed form (433 KB)
DOE clarification
VVS version VVS 2.0
Current status 27 Feb 14 - Approved
Effective approval date: 27 Feb 14
Historic statuses 29 Jan 14 - Request published