17:00 22 Dec 24
Project:
4970 Dak Mi 4 Hydropower Project, Vietnam
- Request for post-registration changes
Project | 4970 Dak Mi 4 Hydropower Project, Vietnam |
---|---|
PRC ref | PRC-4970-001 |
Process track | Issuance |
DOE | DTSUS |
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes |
|
Methodology(ies) list | |
Standardized baseline(s) list | |
DOE conducted validation of the changes | When performing a verification for the project activity or PoA stated above (See footnote 1 below) |
Type of submission |
Corrections that do not affect project design
Permanent changes from the monitoring plan or the monitoring methodology
|
Applicable crediting period | 17 Jan 12 - 16 Jan 19 |
Assessment opinion | Assessment opinion (115 KB) |
Revised PDD | Revised PDD (1636 KB) Revised PDD - track changes (1817 KB) |
Supplementary documents | |
Signed form | Signed form (433 KB) |
DOE clarification | |
VVS version | VVS 2.0 |
Current status | 27 Feb 14 -
Approved
Effective approval date: 27 Feb 14
|
Historic statuses |
29 Jan 14 -
Request published |
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: