Project: 9904 Tanzania Renewable Energy Programme - Request for post-registration changes
Project 9904 Tanzania Renewable Energy Programme
PRC ref PRC-9904-005
Process track Issuance
DOE BVI
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
No changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes When performing a verification for the project activity or PoA stated above (See footnote 1 below)
Type of submission Temporary deviations from the monitoring plan or the monitoring methodology
  • Applicable period for proposed deviations (inclusive): 01 Jan 2018 - 31 Dec 2018
Assessment opinion Assessment opinion (228 KB)
Revised PDD  
Supplementary documents Appendix 1 - CDM-CPA-PRCV-FORM-PRC Darakuta Mini Hydro Project.pdf (91 KB)
Appendix 2 - CDM-CPA-PRCV-FORM-PRC Ikondo Micro Hydro Power Plant.pdf (85 KB)
Signed form Signed form (44 KB)
DOE clarification
VVS version VVS-PoA 2.0
Current status 12 Nov 20 - Approved
Effective approval date: 12 Nov 20
Historic statuses 30 Sep 20 - Request published