06:51 27 Dec 24
Project:
9904 Tanzania Renewable Energy Programme
- Request for post-registration changes
Project | 9904 Tanzania Renewable Energy Programme |
---|---|
PRC ref | PRC-9904-005 |
Process track | Issuance |
DOE | BVI |
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes |
No changes |
Methodology(ies) list | |
Standardized baseline(s) list | |
DOE conducted validation of the changes | When performing a verification for the project activity or PoA stated above (See footnote 1 below) |
Type of submission |
Temporary deviations from the monitoring plan or the monitoring methodology
|
Assessment opinion | Assessment opinion (228 KB) |
Revised PDD | |
Supplementary documents |
Appendix 1 - CDM-CPA-PRCV-FORM-PRC Darakuta Mini Hydro Project.pdf (91 KB)
Appendix 2 - CDM-CPA-PRCV-FORM-PRC Ikondo Micro Hydro Power Plant.pdf (85 KB) |
Signed form | Signed form (44 KB) |
DOE clarification | |
VVS version | VVS-PoA 2.0 |
Current status | 12 Nov 20 -
Approved
Effective approval date: 12 Nov 20
|
Historic statuses |
30 Sep 20 -
Request published |
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: