Project: 2852 Yunnan Saizhu Hydropower Project - Request for post-registration changes
Project 2852 Yunnan Saizhu Hydropower Project
PRC ref PRC-2852-002
Process track Issuance
DOE KFQ
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes When performing a verification for the project activity or PoA stated above (See footnote 1 below)
Type of submission Corrections that do not affect project design
  • All changes are in Appendix 1 of the CDM project standard? Yes
Applicable crediting period 12 Apr 10 - 11 Apr 17
Assessment opinion Assessment opinion (219 KB)
Revised PDD Revised PDD (1188 KB)   Revised PDD - track changes (1191 KB)
Supplementary documents
Signed form Signed form (121 KB)
DOE clarification
VVS version VVS 2.0
Current status 04 Dec 14 - Approved
Effective approval date: 04 Dec 14
Historic statuses 05 Nov 14 - Request published