Project:
3090 Félou Regional Hydropower Project
- Request for post-registration changes
Project | 3090 Félou Regional Hydropower Project |
---|---|
PRC ref | PRC-3090-001 |
Process track | Prior approval |
DOE | TÜV NORD |
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes |
|
Methodology(ies) list | |
Standardized baseline(s) list | |
DOE conducted validation of the changes | When performing a verification for the project activity or PoA stated above (See footnote 1 below) |
Type of submission |
Corrections that do not affect project design
Permanent changes from the monitoring plan or the monitoring methodology
Changes to the project or programme design
Change to the start date of the crediting period
|
Applicable crediting period | 02 Jul 13 - 01 Jul 20 |
Assessment opinion | Assessment opinion (603 KB) |
Revised PDD | Revised PDD (637 KB) Revised PDD - track changes (750 KB) |
Supplementary documents |
Appendix 1 - 3090 CER Calculation.xls (337 KB)
|
Signed form | Signed form (100 KB) |
DOE clarification | |
VVS version | VVS 2.0 |
Current status | 01 Dec 14 -
Approved
Effective approval date: 17 Nov 14
|
Historic statuses |
14 Oct 14 -
Published 14 Oct 14 - Summary note being prepared 27 Oct 14 - Awaiting EB decision |