Project: 3090 Félou Regional Hydropower Project - Request for post-registration changes
Project 3090 Félou Regional Hydropower Project
PRC ref PRC-3090-001
Process track Prior approval
DOE TÜV NORD
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes When performing a verification for the project activity or PoA stated above (See footnote 1 below)
Type of submission Corrections that do not affect project design
  • All changes are in Appendix 1 of the CDM project standard? No

Permanent changes from the monitoring plan or the monitoring methodology
  • All changes are in Appendix 1 of the CDM project standard? No

Changes to the project or programme design
  • Changes have an impact on: None of the above

Change to the start date of the crediting period
  • Proposed start date of crediting period: 02 Jul 2013
Applicable crediting period 02 Jul 13 - 01 Jul 20
Assessment opinion Assessment opinion (603 KB)
Revised PDD Revised PDD (637 KB)   Revised PDD - track changes (750 KB)
Supplementary documents Appendix 1 - 3090 CER Calculation.xls (337 KB)
Signed form Signed form (100 KB)
DOE clarification
VVS version VVS 2.0
Current status 01 Dec 14 - Approved
Effective approval date: 17 Nov 14
Historic statuses 14 Oct 14 - Published
14 Oct 14 - Summary note being prepared
27 Oct 14 - Awaiting EB decision