Project: 7534 Korea South-East Power Co. Renewable Energy Bundling Project - Request for post-registration changes
Project 7534 Korea South-East Power Co. Renewable Energy Bundling Project
PRC ref PRC-7534-001
Process track Prior approval
DOE KTR
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes Prior to commencement of a verification for the project activity or PoA stated above
Type of submission Corrections that do not affect project design
  • All changes are in Appendix 1 of the CDM project standard? Yes

Permanent changes from the monitoring plan or the monitoring methodology
  • All changes are in Appendix 1 of the CDM project standard? Yes

Changes to the project or programme design
  • Changes have an impact on: None of the above
Applicable crediting period 01 Dec 12 - 30 Nov 22
Assessment opinion Assessment opinion (223 KB)
Revised PDD Revised PDD (4655 KB)   Revised PDD - track changes (5371 KB)
Supplementary documents Appendix 1 - 1._ER_sheet_KOSEP.xlsx (23 KB)
Signed form Signed form (81 KB)
DOE clarification DOE clarification 1 - VVS_KOSEP-CDM_PDD_Ver_11.1_(clean).pdf (4641 KB)
DOE clarification 2 - VVS_KOSEP-CDM_PDD_Ver_11.1_(track_changed).pdf (5335 KB)
DOE clarification 3 - VR_revised ver3.0.pdf (208 KB)
DOE clarification 4 - Clarification letter_ktr.pdf (55 KB)
VVS version VVS 2.0
Current status 26 Mar 14 - Approved
Effective approval date: 24 Mar 14
Historic statuses 21 Jan 14 - Published
04 Feb 14 - Awaiting DOE clarifications
17 Feb 14 - DOE clarifications received
17 Feb 14 - Summary note being prepared
03 Mar 14 - Awaiting EB decision