17:11 20 Nov 25
Project:
3125 Biogas Recovery at Ulu Kanchong Palm Oil Mill
- Request for post-registration changes
| Project | 3125 Biogas Recovery at Ulu Kanchong Palm Oil Mill |
|---|---|
| PRC ref | PRC-3125-001 |
| Process track | Prior approval |
| DOE | SIRIM |
|
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes |
|
| Methodology(ies) list | |
| Standardized baseline(s) list | |
| DOE conducted validation of the changes | When performing a verification for the project activity or PoA stated above (See footnote 1 below) |
| Type of submission |
Permanent changes from the monitoring plan or the monitoring methodology
Changes to the project or programme design
|
| Applicable crediting period | 25 Jan 11 - 24 Jan 18 |
| Assessment opinion |
Assessment opinion (198 KB)
|
| Revised PDD |
Revised PDD (1299 KB)
Revised PDD - track changes (1816 KB)
|
| Supplementary documents | |
| Signed form |
Signed form (575 KB)
|
| DOE clarification |
|
| VVS version | VVS 2.0 |
| Current status | 13 Aug 13 - Awaiting DOE clarifications |
| Historic statuses |
30 Jul 13 -
Published 30 Jul 13 - Summary note being prepared |

Assessment opinion