15:37 28 Nov 24
Project:
3125 Biogas Recovery at Ulu Kanchong Palm Oil Mill
- Request for post-registration changes
Project | 3125 Biogas Recovery at Ulu Kanchong Palm Oil Mill |
---|---|
PRC ref | PRC-3125-001 |
Process track | Prior approval |
DOE | SIRIM |
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes |
|
Methodology(ies) list | |
Standardized baseline(s) list | |
DOE conducted validation of the changes | When performing a verification for the project activity or PoA stated above (See footnote 1 below) |
Type of submission |
Permanent changes from the monitoring plan or the monitoring methodology
Changes to the project or programme design
|
Applicable crediting period | 25 Jan 11 - 24 Jan 18 |
Assessment opinion | Assessment opinion (198 KB) |
Revised PDD | Revised PDD (1299 KB) Revised PDD - track changes (1816 KB) |
Supplementary documents | |
Signed form | Signed form (575 KB) |
DOE clarification |
|
VVS version | VVS 2.0 |
Current status | 13 Aug 13 - Awaiting DOE clarifications |
Historic statuses |
30 Jul 13 -
Published 30 Jul 13 - Summary note being prepared |
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: