Project: 1352 Grid-connected Combined Cycle Power Plant of capacity 219.067 MW using Natural Gas/ R-LNG as fuels at Gujarat, India. - Request for post-registration changes
Project 1352 Grid-connected Combined Cycle Power Plant of capacity 219.067 MW using Natural Gas/ R-LNG as fuels at Gujarat, India.
PRC ref PRC-1352-001
Process track Issuance
DOE TÜV NORD
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes When performing a verification for the project activity or PoA stated above (See footnote 1 below)
Type of submission Permanent changes from the monitoring plan or the monitoring methodology
  • All changes are in Appendix 1 of the CDM project standard? Yes
Applicable crediting period 10 Feb 08 - 09 Feb 18
Assessment opinion Assessment opinion (374 KB)
Revised PDD Revised PDD (1143 KB)   Revised PDD - track changes (1147 KB)
Supplementary documents
Signed form Signed form (48 KB)
DOE clarification
VVS version VVS 2.0
Current status 03 Jan 14 - Approved
Effective approval date: 03 Jan 14
Historic statuses 05 Dec 13 - Request published