Project: 10055 Panuco Bagasse Cogeneration Project - Request for post-registration changes
Project 10055 Panuco Bagasse Cogeneration Project
PRC ref PRC-10055-001
Process track Prior approval
DOE TÜV NORD
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes Prior to commencement of a verification for the project activity or PoA stated above
Type of submission Corrections that do not affect project design
  • All changes are in Appendix 1 of the CDM project standard?

Permanent changes from the monitoring plan or the monitoring methodology
  • All changes are in Appendix 1 of the CDM project standard? Yes

Changes to the project or programme design
  • Changes have an impact on: Actual operational parameters differ from the expected parameters
Applicable crediting period 01 Sep 16 - 31 Aug 23
Assessment opinion Assessment opinion (987 KB)
Revised PDD Revised PDD (2033 KB)   Revised PDD - track changes (2211 KB)
Supplementary documents Appendix 1 - 2021 01 29 - Panuco CERs Calculation v5 FES.xlsx (374 KB)
Appendix 2 - Panuco cash flow v5 2020 08 03 FES.xlsx (448 KB)
Signed form Signed form (57 KB)
DOE clarification
VVS version VVS-PA 2.0
Current status 15 Mar 21 - Approved
Effective approval date: 14 Mar 21
Historic statuses 11 Jan 21 - Published
25 Jan 21 - Awaiting DOE clarifications
08 Feb 21 - DOE clarifications received
08 Feb 21 - Summary note being prepared
22 Feb 21 - Awaiting EB decision