Project: 0910 Ningxia Tianjing 50.25MW Wind-farm Project - Request for post-registration changes
Project 0910 Ningxia Tianjing 50.25MW Wind-farm Project
PRC ref PRC-0910-001
Process track Issuance
DOE SGS
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes When performing a verification for the project activity or PoA stated above (See footnote 1 below)
Type of submission Corrections that do not affect project design
  • All changes are in Appendix 1 of the CDM project standard? Yes
Applicable crediting period 12 Apr 07 - 11 Apr 14
Assessment opinion Assessment opinion (3435 KB)
Revised PDD Revised PDD (350 KB)   Revised PDD - track changes (404 KB)
Supplementary documents
Signed form Signed form (1872 KB)
DOE clarification
VVS version VVS 2.0
Current status 08 Mar 13 - Approved
Effective approval date: 08 Mar 13
Historic statuses 07 Feb 13 - Request published