Project: 3378 Landfill Gas Recovery and Flaring Project in the El Verde Landfill, León. - Request for post-registration changes
Project 3378 Landfill Gas Recovery and Flaring Project in the El Verde Landfill, León.
PRC ref PRC-3378-001
Process track Issuance
DOE DNV
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes When performing a verification for the project activity or PoA stated above (See footnote 1 below)
Type of submission Permanent changes from the monitoring plan or the monitoring methodology
  • All changes are in Appendix 1 of the CDM project standard? Yes

Changes to the project or programme design
  • Changes have an impact on: None of the above
Applicable crediting period 27 Oct 10 - 26 Oct 17
Assessment opinion Assessment opinion (204 KB)
Revised PDD Revised PDD (1363 KB)   Revised PDD - track changes (2695 KB)
Supplementary documents Appendix 1 - Difference_ERs_Initial_and_Revised_PDD-3378-24-09.xlsx (89 KB)
Appendix 2 - Economic_Analysis_Leon_LFG_3378-24-09.xls (145 KB)
Signed form Signed form (179 KB)
DOE clarification
VVS version VVS 2.0
Current status 02 Dec 13 - Approved
Effective approval date: 02 Dec 13
Historic statuses 01 Nov 13 - Request published